• Lakewood High School-Major Renovations Campus Wide

    Updated on 11/12/19

    Project information:

    Architect:  Hoffman Architects PA

    Contractor:  Cutler

    PCSB Project Coordinator: Brian Long

    Project Budget: $9.8 Million

    Start Date: July 2017

    Completion: August 2019

     

    Construction/Renovation of:

    Exterior Renovation to include:

    • Update Exterior front of campus
      • stain brick on buildings 1, 3, and 5 to have a uniform look
      • update main entrance to building 1 with a more identifiable entrance
    • Paint exterior of all buildings

    Classroom Buildings 3 and 4

    • Replace windows.

    Auditorium: Building 5

    • Update the lobby entrance with new finishes throughout
    • Add plywood floor on stage and paint black
    • Infill full height windows on the north walls of the auditorium
    • Replace the operable walls in the auditorium with new operable walls
    • Replace the acoustical panels throughout auditorium
    • Repaint interior auditorium throughout
    • Replace ceilings and lights (lights to be LED)

     Courtyard:15,340 square feet

    • Remove existing overhangs and bring new atrium roof to the edge of existing walls
    • Atrium to be a 2 story space that matches the height of building 4. The Roof and rooms 608-610c in building 1 will be removed.  The Atrium will cover the hallway between buildings 1 and 2 and the open space between buildings 1, 2, 6, and 7.  Roof removal is at expansion joints.
    • Convert room B1 107G (lockers) into secondary serving line for cafeteria, provide power requirements as needed.

    New gym lobby addition to be an estimated 3,900 square feet: Building 7

    • New gym lobby to have concession stand at an estimated 400 square feet
    • New restrooms in gym lobby to be an estimated 800 square feet
    • Gym lobby custodial closet to be an estimated 65 square feet
    • New ticket booth at an estimated 60 square
    • New trainer’s room at an estimated 140 square feet
    • New trophy cases

    New wrestling room to be an estimated 3,000 square feet: South Side of Building 7

    • Current wall between weight room and wrestling room to be removed and replaced with storefront system

    Renovation of the Gymnasium to include:

    • Replace the HVAC as the chiller is old and will be too small to accommodate the new additional square feet
    • Clean all existing HVAC duct and paint
    • Infill the windows at the end walls with cmu block
    • New basketball goals – make sure each is installed the same distance from the end lines
    • Refinish basketball court
    • Remove lay in ceiling
    • Remove any existing unused electrical conduit on walls
    • Replace lights
    • Refinish bleachers
    • Replace the sound/PA system
    • Add 2 practice basketball goals
    • Install acoustical treatments

    Project status:

    • Project is Complete